Barnsley Metrodome Refurbishment
A new look for Barnsley Metrodome is now complete.
Following the completion of Phase 1 of our refurbishment works, visitors are now greeted with a refreshed reception, welcoming entrance, modernised servery, refurbished toilets and new floor coverings.
Delivered for BPL (Barnsley Premier Leisure), these upgrades set the tone for the wider transformation taking place at one of the town’s most recognisable leisure destinations.
Works comprised
- Strip out and demolition
- Mechanical and Electrical strip out
- Stud/blockwork walls/glazed screens
- Plasterworks
- New reception desk installs
- Glass barrier rail
- Installation of new toilet cubicles and sanitaryware
- New suspended ceilings
- Mechanical and Electrical installations
- Refurbishment and decorations
- Floor, ceiling, tiling and wall finishes
- Fire doors replacement.
Phase 2 sees our team turning their attention to the bowling alley refurbishment, changing this to an indoor adventure play area opening in autumn.
Works will comprise
- Strip out and demolition
- Mechanical and Electrical strip out
- Stud walls
- Plasterworks
- New reception desk
- Installation of new toilet and sanitaryware
- Dedicated baby change room.
- New suspended ceilings, with feature lighting
- Mechanical and Electrical installations including upgraded lighting levels throughout
- Decorations
- Floor, ceiling, tiling and wall finishes
- Fire doors replacement.