NU Construction has recently completed a significant project for 151 Products Ltd, a reputable UK-based wholesale supplier established in 1997. 151 Products specialises in providing affordable household, DIY, gardening, pet, and automotive items.
NU Construction was awarded the contract to build a high bay warehouse to support 151 Products' operational needs. The project was strategically divided into two key phases to ensure smooth progression and minimal disruption.
Phase 1: Enabling Works The initial phase involved essential enabling works focused on modifying the existing service yard. Key activities included:
These works facilitated the decanting of two existing parking areas, preparing the site efficiently for the subsequent phase. Additionally, a smaller car park adjacent to the main entrance was segregated to provide space for NU Construction's offices and welfare facilities during the project.
Phase 2: Main New Build Warehouse The second phase centred on constructing the new high bay warehouse on the larger car park area. This phase encompassed:
The electrical package included the installation of steel pedestrian doors, small power systems, IT infrastructure, high bay lighting, a forklift charging station, and new fire aspiration systems.
Externally, the project delivered perimeter gravel footpaths, a GrassCrete access road, and reformed levels to create comprehensive hard and soft landscaping. The new warehouse was connected internally to the existing warehouse via an internal roller shutter to facilitate seamless operations.
NU Construction successfully delivered a high-quality high bay warehouse tailored to the specific needs of 151 Products Ltd. The phased approach allowed for operational continuity and site readiness, reflecting NU Construction's commitment to efficiency, quality, and client satisfaction.