New Warehouse Extension
Duration // 26 Weeks

New Warehouse Extension.

Location // Nottinghamshire

A Design and Build contract comprising the demolition of an existing single storey brick built building including asbestos removal works to allow the construction of a steel framed and metal clad extension to the existing warehouse along with associated car parking all carried out whilst the client continued operations within the existing site boundaries

Latest Projects.

  • Liverpool//
  • National Farmers Union Mutual

2-8 Church Street

read more
  • Rotherham//
  • Parseq

Warehouse Extension

read more
  • Redditch//
  • Kettler (GB)

Warehouse Extension

read more
  • Heckmondwike//
  • LCP Properties

Unit 1 Retail Unit, Heckmondwike

read more
  • Holme Valley//
  • Kirklees PCT

Holme Valley Hospital

read more
  • Rochdale//
  • Eric Wright Partnership Ltd

Kirkholt Medical Centre

read more

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co

Nu are led by an experienced and competent senior team who involve eliminating problems on a non-confrontational and non-contractual basis. Their attitude to recognising the importance of good management with regards to Health & safety is very evident.

  • Richard Green
  • Director
  • Spring&Co