Extension to existing building to provide 2500 m2 additional floor space.
Construction of an industrial assembly building with steel frame, metal roof and wall cladding; all on concrete slab
and pad foundations.
Parseq remained fully operational throughout the duration of the works.
This global engineering company is now benefiting from a fully operational facility
A particular strength of Nu Construction is their personal attention to detail and the aptitude of their Managing Director and Commercial Director whose communication capabilities provide concise problem-solving results.