Chancery Place Office Refurbishment
Duration // 18 Weeks

Chancery Place Office Refurbishment.

Location // Manchester

NU Construction were awarded this contract to refurbish floors 1-4, Chancery House, Manchester.

Works to the Grade A office accommodation included: -

  • Stripping out of existing furniture, ceilings, partitions and light fittings
  • Stripping out rolling filing system
  • New M&E Services to accommodate open plan office environment
  • New flooring
  • Toilet refurbishment
  • Decoration, ceiling works and cleaning.

Following the successful refurbishment of floors 1-4 in January 2021, we were awarded the exclusive 14th floor office refurbishment and works to the adjoining external terrace lounge as well as works to the reception area, again very exclusive and high-end refurbishment using unfamiliar methods of materials. 

The works were undertaken over two phases whilst keeping the reception and tenant access fully operational. 

April 2022 sees us being awarded the refurbishment to the 13th floor; works are ongoing.

Latest Projects.

  • Liverpool//
  • National Farmers Union Mutual

2-8 Church Street

read more
  • Rotherham//
  • Parseq

Warehouse Extension

read more
  • Redditch//
  • Kettler (GB)

Warehouse Extension

read more
  • Heckmondwike//
  • LCP Properties

Unit 1 Retail Unit, Heckmondwike

read more
  • Holme Valley//
  • Kirklees PCT

Holme Valley Hospital

read more
  • Rochdale//
  • Eric Wright Partnership Ltd

Kirkholt Medical Centre

read more

A particular strength of Nu Construction is their personal attention to detail and the aptitude of their Managing Director and Commercial Director whose communication capabilities provide concise problem-solving results.

  • Andrew Cliffe
  • Partner
  • Ryden LLP

A particular strength of Nu Construction is their personal attention to detail and the aptitude of their Managing Director and Commercial Director whose communication capabilities provide concise problem-solving results.

  • Andrew Cliffe
  • Partner
  • Ryden LLP