Works comprised an extension to existing building to provide 2500 m2 additional floor space.
Construction of an industrial assembly building with steel frame, metal roof and wall cladding; all on concrete slab and pad foundations.
Parseq remained fully operational throughout the duration of the works. This global engineering company is now benefiting from a fully operational facility.
It is an enormous credit to your team the building was ready and that the work had been completed to such a high standard.